
Heavy goods vehicles taking the turbines and other materials to the site will travel along the M1, A57 and then on Penny Hill Lane to create minimal disturbance. The windfarm is set to be operational next March.
Heavy goods vehicles taking the turbines and other materials to the site will travel along the M1, A57 and then on Penny Hill Lane to create minimal disturbance. The windfarm is set to be operational next March.